POWER
Enough to power
your company or an entire city.
Immediate Power Availability
in All Our Industrial Parks
Immediate power availability is guaranteed through on-site substations and power generation facilities connected to the electrical grid.
Immediate power
With expansion capability
Long-term energy security is reinforced by a 200 MW on-site power generation plant currently under development.
Available voltages:
WATER
- 2 million m3 per year.
- Water Treatment Facilities.
- Fire Protection System/ Pressure 120 psi NFPA.
- Fire hydrants on the sidewalk.
NATURAL GAS
- High Availability for any Project available.
- Connection directly with supplier.
OPTICAL FIBER
- Fiber ducts available for contracting with the provider that suits your preference.
- Connection at boundary of property.
CUSTOMS OFFICE
- WTC 1 features the customs office for the State of SLP.
- Facilitate all the import and export procedures our clients need.
Helping industrial companies
become more efficient.

Up to 2 years of storage exempt from duties and taxes.

No inspection from authorities at ports of entry.

Three times faster than importing at ports of entry.

Tax payment deferreal.

Import/Export possible on site.
INTERMODAL TERMINAL
Connecting your business
to the world.
- Lazaro Cardenas (Pacific Ocean).
- Veracruz (Gulf of Mexico).
- Altamira (Gulf of Mexico).
- Laredo (US border).
We are the largest Intermodal Terminal in Mexico, owned and operated by CPKC.
Our Industrial Parks
In San Luis Potosi, where our industrial park is located, it is recognized for its business-friendly ecosystem and well-developed infrastructure.
COMMERCIAL AREA
Restaurants, convenience stores,
services and hotel.






